- Cara Pembayaran Tunai
- Cara Pembayaran Tunai Keras (12 bulan)
- Cara Pembayaran KPR
Cara Pembayaran Tunai
Tanda jadi | Rp. 5.000.000 | hari ke-1 |
Uang Muka | 20% dikurangi tanda jadi | hari ke-15 |
Sisa | 80% | hari ke-31 |
Cara Pembayaran Tunai Keras (12 bulan)
Tanda jadi | Rp. 5.000.000 | hari ke-1 |
Uang Muka | 50% dikurangi tanda jadi | hari ke-15 |
Sisa | 50% diangsur 12 bulan. Angusuran ke-1 | hari ke-31 |
Cara Pembayaran KPR
Tanda jadi | Rp. 5.000.000 | hari ke-1 |
Uang Muka | 20% dikurangi tanda jadi | hari ke-15 |
Sisa | 80% | KPR |
harga Ruko CITOS 2, 16 April 2012
Blok | No | Tipe | LB | LT | Harga | ||
TUNAI | 12 BLN | KPR | |||||
CS02 | RCS.01/3,6 | B | 120 | 88 | 673,920,000 | 740,712,000 | 724,014,000 |
| RCS.03/01 | E1 | 180 | 110 | 989,400,000 | 1,087,740,000 | 1,063,155,000 |
| RCS.03/12 | E | 180 | 110 | 989,400,000 | 1,087,740,000 | 1,063,155,000 |
| RCS.03/3-7, 11 | F | 144 | 88 | 751,360,000 | 825,896,000 | 807,262,000 |
Blok | No | LB | LT | DP 20% | Angsuran KPR (Bunga 7,5%) | ||
5 th | 8 th | 10 th | |||||
CS02 | RCS.01/3,6 | 120 | 88 | 144,802,800 | 11,606,204 | 8,041,693 | 6,875,339 |
| RCS.03/01 | 180 | 110 | 212,631,000 | 17,042,756 | 11,808,565 | 10,095,870 |
| RCS.03/12 | 180 | 110 | 212,631,000 | 17,042,756 | 11,808,566 | 10,095,870 |
| RCS.03/3-7, 11 | 144 | 88 | 161,452,400 | 12,940,700 | 8,966,338 | 7,665,874 |
Harga April - Mei 2012 Ruko Shopping Street 9
No | Tipe | LB | LT | Harga | Harga | Harga |
TUNAI | 12 BLN | KPR | ||||
1, 27 | Ruko A | 63 | 75 | 421,800,000 | 463,380,000 | 452,985,000 |
5, 9, 18, 23 | Ruko B | 50 | 60 | 309,600,000 | 339,960,000 | 332,370,000 |
3, 6, 8, 10, 12, 15, 17, 19, 21, 25 | Ruko C | 51 | 60 | 313,230,000 | 343,953,000 | 336,272,250 |
2,7,11,16,20,26 | Ruko D | 51 | 60 | 313,230,000 | 343,953,000 | 336,272,250 |
DP, Cicilan
Tipe | LB | LT | Harga | DP 10% | Angsuran KPR (Bunga 7,5%) | ||
KPR | 5 th | 8 th | 10 th | ||||
Ruko A | 63 | 75 | 452,985,000 | 45,298,500 | 8,169,201 | 5,660,267 | 4,839,311 |
Ruko B | 50 | 60 | 332,370,000 | 33,237,000 | 5,994,012 | 4,153,124 | 3,550,762 |
Ruko C | 51 | 60 | 336,272,250 | 33,627,225 | 6,064,385 | 4,201,885 | 3,592,450 |
Ruko D | 51 | 60 | 336,272,250 | 33,627,225 | 6,064,385 | 4,201,885 | 3,592,450 |
Harga Kios Citra Indah Square, 16 April 2012
Harga KIOS | ||||||
Blok | No | Tipe | LB | LT | Harga | Harga |
TUNAI | 12 BLN | |||||
CS19 | 20,25-27 | A | 9 | 9 | 52,495,000 | 57,494,500 |
CS20 | 7,20 | A | 9 | 9 | 52,495,000 | 57,494,500 |
CS23 | 15,27-18 | A | 9 | 9 | 49,525,000 | 54,227,500 |
CS26 | 5 | D | 7,5 | 7,5 | 42,512,500 | 46,513,750 |
| 6-9, 15 | D | 7,5 | 7,5 | 41,687,500 | 45,606,250 |
KIOS Cicilan 12 bulan
Harga KIOS | |||||||
Blok | No | Tipe | LB | LT | Harga | DP 30% |
|
12 BLN | 12bln | ||||||
CS19 | 20,25-27 | A | 9 | 9 | 57,494,500 | 17,248,350 | 3,353,846 |
CS20 | 7,20 | A | 9 | 9 | 57,494,500 | 17,248,350 | 3,353,846 |
CS23 | 15,27-18 | A | 9 | 9 | 54,227,500 | 16,268,250 | 3,163,271 |
CS26 | 5 | D | 7,5 | 7,5 | 46,513,750 | 13,954,125 | 2,713,302 |
| 6-9, 15 | D | 7,5 | 7,5 | 45,606,250 | 13,681,875 | 2,660,365 |
Ruko SS7, Nomor Ruko
Blok | Nomor | Tipe | LB/LT |
SS05 | 1,23 | A | 63/80 |
| 2,5,7,9,11,15,17,19,21 | B | 50/64 |
| 6,10,16,20 | C | 51/64 |
| 3,8,12,18 | D | 51/64 |
- Ruko A, dengan luas bangunan 63 m2 dan luas tanah 80 m2.
- Ruko B, dengan luas bangunan 50 m2 dan luas tanah 64 m2.
- Ruko C & D, dengan luas bangunan 51 m2 dan luas tanah 64 m2.
Spesifikasi :
- Lantai : Keramik
- Rangka atap : Baja ringan
- Atap : Genteng beton
- Kusen : Kamper banjar / setara
- Daun pintu/jendela : Kayu meranti / setara
- Sanitasi : Bak mandi fiberglass, closet duduk
- Saluran : Precast terbuka
- Pintu depan : Semi panel
- Pintu dalam : Double tripleks
- Pintu KM/WC : Pintu PVC
- Listrik : 2.200 watt
- Air : PDAM
Keterangan:
- Harga sudah termasuk PPN, IMB, Listrik 2200 watt, dan PAM
- Harga belum termasuk Akte Jual Beli, BBN sertifikat HGB, biaya perolehan hak atas tanah dan bangunan (BPHTB)
- Harga belum termasuk biaya KPR
- Pembelian di atas Rp 60 juta, dimohon melampirkan NPWP pribadi.