Kluster bukit Alamanda di Citra Indah Tipe 48 memiliki tiga ukuran tanah.Pertama 48/180, 48/200, dan 48/240. Tinggal 3 unit lagi alamanda luas tipe LB 48 LT 219,1m, 259m, 271,56m. Bisa beli kavling saja.
Tersedia stok
V.01/35, kavling 479.31m
V.10/18, rumah LB/LT 48/274.44
V.10/29, kavling 219.01m
V.10/30, kavling 259m
POndasi | Batu kali |
Dinding | Bata merah, diaci, dan dicat |
Lantai | Keramik |
Rangka atap | Baja ringan |
Atap | Genteng beton |
Kusen | Kamper Banjar/setara |
Daun pintu/jendela | Kayu meranti/setara |
Sanitasi | Bak mandi fiberglass, closet duduk |
Saluran | Precast terbuka |
Pintu dean | Semi panel |
Pintu dalam | Double tripleks |
KM/WC | Pintu PVC |
Listrik | 1300 watt |
Air | PDAM |
Alamanda tipe 48 mempunyai dua ukuran tanah 48/180 dan 48/200.
Tipe 48/180
Harga
Klik tautan berikut HARGA BARU CITRA INDAH
Stok
Klik tautan berikut STOK CITRA INDAH
Tipe, LB/LT |
Harga |
Harga |
Blok |
Tunai |
KPR ke-1 |
||
48/479.31 |
877.035.508 |
964.539.058 |
V.01.035 |
48/274,44 |
609.916.930 |
670.708.623 |
V.10/18 |
48/242,57 |
567.585.603 |
624.144.163 |
V.10/27 |
48/219,1 |
534.911.575 |
588.202.733 |
V.10/29 |
48/259 |
589.408.750 |
648.149.625 |
V.10.30 |
48/271,56 |
606.091.570 |
666.500.727 |
V.10/32 |
Dp 5% + Biaya KPR (lihat promo) = modal pertama
Tipe, LB/LT |
Harga |
DP 5% |
PLAFON KPR |
Estimasi |
Modal Pertama |
KPR ke-1 |
bea KPR |
DP+ bea kpr |
|||
48/479.31 |
964.539.058 |
48.226.953 |
916.312.105 |
45.815.605 |
94.042.558 |
48/274,44 |
670.708.623 |
33.535.431 |
637.173.192 |
31.858.660 |
65.394.091 |
48/242,57 |
624.144.163 |
31.207.208 |
592.936.955 |
29.646.848 |
60.854.056 |
48/219,1 |
588.202.733 |
29.410.137 |
558.792.596 |
27.939.630 |
57.349.766 |
48/259 |
648.149.625 |
32.407.481 |
615.742.144 |
30.787.107 |
63.194.588 |
48/271,56 |
666.500.727 |
33.325.036 |
633.175.691 |
31.658.785 |
64.983.821 |
Estimasi angsuran dengan bunga 9.75 dan dp 5%.
Tipe, LB/LT |
PLAFON KPR |
Angsuran KPR/bln (Bunga 9.75%, BCA) |
||||
5th |
8th |
10th |
15th |
20th |
||
48/479.31 |
916.312.105 |
19.356.400 |
13.783.352 |
11.982.636 |
9.707.068 |
8.691.375 |
48/274,44 |
637.173.192 |
13.459.802 |
9.584.488 |
8.332.329 |
6.749.975 |
6.043.695 |
48/242,57 |
592.936.955 |
12.525.345 |
8.919.078 |
7.753.851 |
6.281.353 |
5.624.107 |
48/219,1 |
558.792.596 |
11.804.071 |
8.405.472 |
7.307.344 |
5.919.640 |
5.300.242 |
48/259 |
615.742.144 |
13.007.087 |
9.262.118 |
8.052.075 |
6.522.942 |
5.840.418 |
48/271,56 |
633.175.691 |
13.375.358 |
9.524.357 |
8.280.054 |
6.707.627 |
6.005.778 |
Note:
- Harga dan stok berubah setiap saat.
- Harga resmi adalah harga yang tertera di surat pesanan rumah (SPR).
- Angsuran resmi adalah angsuran yang dirilis bank di Surat Persetujuan KPR atau offering letter (SP3K) bank pemberi kredit kepemilikan rumah (KPR).
- Harga mengikat selama 3 bulan, jika dalam 3 bulan belum akad, maka akan dikenakan penyesuain harga baru.
- Harga belum termasuk charge taman, jika di samping/depan rumah terdapat taman atau jalur hijau.
- Jika KPR ditolak bank maka akan dipotong biaya administrasi Rp 2.5 juta (tarif saat ini, berubah setiap saat) dari uang konsumen yang sudah masuk.
- Aturan atau kebijakan lain dapat dibaca di surat pesanan rumah (SPR).
- Untuk menghindari salah paham, baca dengan teliti pasal-pasal atau syarat dan ketentuan di surat pesanan rumah.
Harga Juni 20114
Harga Alamanda Cash, Angsuran bertahap 12x dan 24x ke developer, dan KPR 1, KPR2
Tipe, LB/LT |
Harga |
Harga |
Harga |
Harga |
Harga |
Keterangan |
Tunai |
12 bulan |
24 bulan |
KPR ke-1 |
KPR ke-2 |
|
|
48/479.31 |
841,039,355 |
945,919,274 |
1,008,847,226 |
924,943,291 |
966,895,258 |
V.01.035 |
48/274,44 |
585,752,020 |
658,721,023 |
702,127,424 |
644,127,222 |
673,064,823 |
V.10/18 |
48/242,57 |
545,261,185 |
613,168,833 |
653,538,422 |
599,587,304 |
626,500,363 |
V.10/27 |
48/219,1 |
513,942,550 |
577,935,369 |
616,068,560 |
565,136,805 |
590,558,933 |
V.10/29 |
48/259 |
566,135,500 |
636,652,438 |
678,587,600 |
622,549,050 |
650,505,825 |
V.10.30 |
48/271,56 |
582,092,980 |
654,604,603 |
697,736,576 |
640,102,278 |
668,856,927 |
V.10/32 |
DP 5% KPR ke-1
Tipe, LB/LT |
Harga |
DP 5% |
PLAFON KPR |
Estimasi |
Modal Pertama |
Keterangan |
KPR ke-1 |
bea KPR |
DP+bea kpr |
|
|||
48/479.31 |
924,943,291 |
46,247,165 |
878,696,126 |
43,934,806 |
90,181,971 |
V.01.035 |
48/274,44 |
644,127,222 |
32,206,361 |
611,920,861 |
30,596,043 |
62,802,404 |
V.10/18 |
48/242,57 |
599,587,304 |
29,979,365 |
569,607,939 |
28,480,397 |
58,459,762 |
V.10/27 |
48/219,1 |
565,136,805 |
28,256,840 |
536,879,965 |
26,843,998 |
55,100,838 |
V.10/29 |
48/259 |
622,549,050 |
31,127,453 |
591,421,598 |
29,571,080 |
60,698,532 |
V.10.30 |
48/271,56 |
640,102,278 |
32,005,114 |
608,097,164 |
30,404,858 |
62,409,972 |
V.10/32 |
Angsuran dengan DP 5% bunga 9.75%
Tipe, LB/LT |
PLAFON KPR |
Angsuran KPR/bln (Bunga 9.75%, BCA) |
Keterangan |
||||
5th |
8th |
10th |
15th |
20th |
|
||
48/479.31 |
878,696,126 |
18,561,791 |
13,217,525 |
11,490,731 |
9,308,579 |
8,190,601 |
V.01.035 |
48/274,44 |
611,920,861 |
12,926,365 |
9,204,638 |
8,002,104 |
6,482,461 |
5,703,905 |
V.10/18 |
48/242,57 |
569,607,939 |
12,032,537 |
8,568,158 |
7,448,777 |
6,034,214 |
5,309,493 |
V.10/27 |
48/219,1 |
536,879,965 |
11,341,183 |
8,075,857 |
7,020,792 |
5,687,506 |
5,004,426 |
V.10/29 |
48/259 |
591,421,598 |
12,493,334 |
8,896,284 |
7,734,035 |
6,265,300 |
5,512,825 |
V.10.30 |
48/271,56 |
608,097,164 |
12,845,593 |
9,147,121 |
7,952,101 |
6,441,954 |
5,668,263 |
V.10/32 |
DP 10% KPR ke-1
Tipe, LB/LT |
Harga |
DP 10% |
PLAFON KPR |
Estimasi |
Modal Pertama |
Keterangan |
KPR ke-1 |
bea KPR |
DP+bea kpr |
|
|||
48/479.31 |
924,943,291 |
92,494,329 |
832,448,962 |
41,622,448 |
134,116,777 |
V.01.035 |
48/274,44 |
644,127,222 |
64,412,722 |
579,714,500 |
28,985,725 |
93,398,447 |
V.10/18 |
48/242,57 |
599,587,304 |
59,958,730 |
539,628,574 |
26,981,429 |
86,940,159 |
V.10/27 |
48/219,1 |
565,136,805 |
56,513,681 |
508,623,125 |
25,431,156 |
81,944,837 |
V.10/29 |
48/259 |
622,549,050 |
62,254,905 |
560,294,145 |
28,014,707 |
90,269,612 |
V.10.30 |
48/271,56 |
640,102,278 |
64,010,228 |
576,092,050 |
28,804,603 |
92,814,830 |
V.10/32 |
Angsuran dengan DP 10% bunga 9.75%
Tipe, LB/LT |
PLAFON KPR |
Angsuran KPR/bln (Bunga 9.75%, BCA) |
Keterangan |
||||
5th |
8th |
10th |
15th |
20th |
|
||
48/479.31 |
832,448,962 |
17,584,855 |
12,521,866 |
10,885,955 |
8,818,653 |
7,759,516 |
V.01.035 |
48/274,44 |
579,714,500 |
12,246,030 |
8,720,183 |
7,580,941 |
6,141,279 |
5,403,700 |
V.10/18 |
48/242,57 |
539,628,574 |
11,399,245 |
8,117,202 |
7,056,736 |
5,716,624 |
5,030,046 |
V.10/27 |
48/219,1 |
508,623,125 |
10,744,279 |
7,650,812 |
6,651,277 |
5,388,163 |
4,741,035 |
V.10/29 |
48/259 |
560,294,145 |
11,835,790 |
8,428,058 |
7,326,980 |
5,935,547 |
5,222,676 |
V.10.30 |
48/271,56 |
576,092,050 |
12,169,509 |
8,665,693 |
7,533,570 |
6,102,904 |
5,369,934 |
V.10/32 |
DP 30% KPR ke-2
Tipe, LB/LT |
Harga |
DP 30% |
PLAFON KPR |
Estimasi |
Modal Pertama |
Keterangan |
KPR ke-2 |
bea KPR |
DP+bea kpr |
|
|||
48/479.31 |
966,895,258 |
290,068,577 |
676,826,681 |
33,841,334 |
323,909,911 |
V.01.035 |
48/274,44 |
673,064,823 |
201,919,447 |
471,145,376 |
23,557,269 |
225,476,716 |
V.10/18 |
48/242,57 |
626,500,363 |
187,950,109 |
438,550,254 |
21,927,513 |
209,877,622 |
V.10/27 |
48/219,1 |
590,558,933 |
177,167,680 |
413,391,253 |
20,669,563 |
197,837,243 |
V.10/29 |
48/259 |
650,505,825 |
195,151,748 |
455,354,078 |
22,767,704 |
217,919,451 |
V.10.30 |
48/271,56 |
668,856,927 |
200,657,078 |
468,199,849 |
23,409,992 |
224,067,071 |
V.10/32 |
Angsuran dengan DP 30% bunga 9.75%
Tipe, LB/LT |
PLAFON KPR |
Angsuran KPR/bln (Bunga 9.75%, BCA) |
Keterangan |
||||
5th |
8th |
10th |
15th |
20th |
|
||
48/479.31 |
676,826,681 |
14,297,452 |
10,180,964 |
8,850,879 |
7,170,049 |
6,308,913 |
V.01.035 |
48/274,44 |
471,145,376 |
9,952,590 |
7,087,064 |
6,161,179 |
4,991,138 |
4,391,693 |
V.10/18 |
48/242,57 |
438,550,254 |
9,264,042 |
6,596,762 |
5,734,932 |
4,645,838 |
4,087,864 |
V.10/27 |
48/219,1 |
413,391,253 |
8,732,578 |
6,218,315 |
5,405,927 |
4,379,313 |
3,853,349 |
V.10/29 |
48/259 |
455,354,078 |
9,619,010 |
6,849,528 |
5,954,676 |
4,823,851 |
4,244,497 |
V.10.30 |
48/271,56 |
468,199,849 |
9,890,368 |
7,042,757 |
6,122,661 |
4,959,934 |
4,364,237 |
V.10/32 |
Harga 26 Mei 2014
Tipe, LB/LT |
Harga |
Harga |
Harga |
Keterangan |
Tunai |
12 bulan |
KPR ke-1 |
|
|
48/479.31 |
841,039,355 |
945,919,274 |
924,943,291 |
V.01.035 |
48/274,44 |
585,752,020 |
658,721,023 |
644,127,222 |
V.10/18 |
48/242,57 |
545,261,185 |
613,168,833 |
599,587,304 |
V.10/27 |
48/219,1 |
513,942,550 |
577,935,369 |
565,136,805 |
V.10/29 |
48/259 |
566,135,500 |
636,652,438 |
622,549,050 |
V.10.30 |
48/271,56 |
582,092,980 |
654,604,603 |
640,102,278 |
V.10/32 |
Modal Pertama = DP + Biaya KPR
Tipe, LB/LT |
Harga |
DP 5% |
PLAFON KPR |
Estimasi |
Modal Pertama |
Keterangan |
KPR ke-1 |
bea KPR |
DP+bea kpr |
|
|||
48/479.31 |
924,943,291 |
46,247,165 |
878,696,126 |
43,934,806 |
90,181,971 |
V.01.035 |
48/274,44 |
644,127,222 |
32,206,361 |
611,920,861 |
30,596,043 |
62,802,404 |
V.10/18 |
48/242,57 |
599,587,304 |
29,979,365 |
569,607,939 |
28,480,397 |
58,459,762 |
V.10/27 |
48/219,1 |
565,136,805 |
28,256,840 |
536,879,965 |
26,843,998 |
55,100,838 |
V.10/29 |
48/259 |
622,549,050 |
31,127,453 |
591,421,598 |
29,571,080 |
60,698,532 |
V.10.30 |
48/271,56 |
640,102,278 |
32,005,114 |
608,097,164 |
30,404,858 |
62,409,972 |
V.10/32 |
Simulasi angsuran dengan bunga 9.75%, DP 5%
Tipe, LB/LT |
PLAFON KPR |
Angsuran KPR/bln (Bunga 9.75%) |
Keterangan |
||||
5th |
8th |
10th |
15th |
20th |
|
||
48/479.31 |
878,696,126 |
18,561,791 |
13,217,525 |
11,490,731 |
9,308,579 |
8,190,601 |
V.01.035 |
48/274,44 |
611,920,861 |
12,926,365 |
9,204,638 |
8,002,104 |
6,482,461 |
5,703,905 |
V.10/18 |
48/242,57 |
569,607,939 |
12,032,537 |
8,568,158 |
7,448,777 |
6,034,214 |
5,309,493 |
V.10/27 |
48/219,1 |
536,879,965 |
11,341,183 |
8,075,857 |
7,020,792 |
5,687,506 |
5,004,426 |
V.10/29 |
48/259 |
591,421,598 |
12,493,334 |
8,896,284 |
7,734,035 |
6,265,300 |
5,512,825 |
V.10.30 |
48/271,56 |
608,097,164 |
12,845,593 |
9,147,121 |
7,952,101 |
6,441,954 |
5,668,263 |
V.10/32 |
Harga cash, Angsuran ke developer 24x, dan KPR ke-2,
Tipe, LB/LT |
Harga |
Harga |
Harga |
Keterangan |
Tunai |
24 bulan |
KPR ke-2 |
|
|
48/479.31 |
841,039,355 |
1,008,847,226 |
966,895,258 |
V.01.035 |
48/274,44 |
585,752,020 |
702,127,424 |
673,064,823 |
V.10/18 |
48/242,57 |
545,261,185 |
653,538,422 |
626,500,363 |
V.10/27 |
48/219,1 |
513,942,550 |
616,068,560 |
590,558,933 |
V.10/29 |
48/259 |
566,135,500 |
678,587,600 |
650,505,825 |
V.10.30 |
48/271,56 |
582,092,980 |
697,736,576 |
668,856,927 |
V.10/32 |
Modal pertama = DP + Biaya KPR
Tipe, LB/LT |
Harga |
DP 30% |
PLAFON KPR |
Estimasi |
Modal Pertama |
KPR ke-2 |
bea KPR |
DP+bea kpr |
|||
48/479.31 |
966,895,258 |
290,068,577 |
676,826,681 |
33,841,334 |
323,909,911 |
48/274,44 |
673,064,823 |
201,919,447 |
471,145,376 |
23,557,269 |
225,476,716 |
48/242,57 |
626,500,363 |
187,950,109 |
438,550,254 |
21,927,513 |
209,877,622 |
48/219,1 |
590,558,933 |
177,167,680 |
413,391,253 |
20,669,563 |
197,837,243 |
48/259 |
650,505,825 |
195,151,748 |
455,354,078 |
22,767,704 |
217,919,451 |
48/271,56 |
668,856,927 |
200,657,078 |
468,199,849 |
23,409,992 |
224,067,071 |
Simulasi Angsuran KPR ke-2 dengan DP 30% bunga 9.75
Tipe, LB/LT |
PLAFON KPR |
Angsuran KPR/bln (Bunga 9.75%, BCA) |
||||
5th |
8th |
10th |
15th |
20th |
||
48/479.31 |
676,826,681 |
14,297,452 |
10,180,964 |
8,850,879 |
7,170,049 |
6,308,913 |
48/274,44 |
471,145,376 |
9,952,590 |
7,087,064 |
6,161,179 |
4,991,138 |
4,391,693 |
48/242,57 |
438,550,254 |
9,264,042 |
6,596,762 |
5,734,932 |
4,645,838 |
4,087,864 |
48/219,1 |
413,391,253 |
8,732,578 |
6,218,315 |
5,405,927 |
4,379,313 |
3,853,349 |
48/259 |
455,354,078 |
9,619,010 |
6,849,528 |
5,954,676 |
4,823,851 |
4,244,497 |
48/271,56 |
468,199,849 |
9,890,368 |
7,042,757 |
6,122,661 |
4,959,934 |
4,364,237 |
Harga Desember 2013 bukit ALAMANDA
Tipe, LB/LT |
Harga |
Harga |
Harga |
Keterangan |
Tunai |
12 bulan |
KPR ke-1 |
|
|
48/479.31 |
789.931.126 |
885.235.017 |
865.574.239 |
V.01.035 |
48/274,44 |
549.390.655 |
618.001.987 |
604.279.721 |
V.10/18 |
48/242,57 |
511.660.559 |
575.555.629 |
562.776.615 |
V.10/27 |
48/219,1 |
482.375.013 |
542.609.389 |
530.562.514 |
V.10/29 |
48/259 |
531.111.625 |
597.438.078 |
584.172.788 |
V.10.30 |
48/271,56 |
545.981.095 |
614.166.232 |
600.529.205 |
V.10/32 |
Mdoal pertama = DP + Biaya KPR + Biaya surat2
Tipe, LB/LT |
Harga |
DP 10% |
PLAFON KPR |
Estimasi |
Modal Pertama |
Keterangan |
KPR ke-1 |
bea KPR |
DP+bea kpr |
|
|||
48/479.31 |
865.574.239 |
86.557.424 |
779.016.815 |
38.950.841 |
125.508.265 |
V.01.035 |
48/274,44 |
604.279.721 |
60.427.972 |
543.851.749 |
27.192.587 |
87.620.560 |
V.10/18 |
48/242,57 |
562.776.615 |
56.277.662 |
506.498.954 |
25.324.948 |
81.602.609 |
V.10/27 |
48/219,1 |
530.562.514 |
53.056.251 |
477.506.263 |
23.875.313 |
76.931.565 |
V.10/29 |
48/259 |
584.172.788 |
58.417.279 |
525.755.509 |
26.287.775 |
84.705.054 |
V.10.30 |
48/271,56 |
600.529.205 |
60.052.921 |
540.476.285 |
27.023.814 |
87.076.735 |
V.10/32 |
Angsuran dengan asumsi bunga 9%
Tipe, LB/LT |
PLAFON KPR |
Angsuran KPR/bln (Bunga 9%, BCA) |
Keterangan |
|||
5th |
8th |
10th |
15th |
|
||
48/479.31 |
779.016.815 |
16.171.108 |
11.412.755 |
9.868.256 |
7.901.307 |
V.01.035 |
48/274,44 |
543.851.749 |
11.289.468 |
7.967.539 |
6.889.284 |
5.516.107 |
V.10/18 |
48/242,57 |
506.498.954 |
10.514.085 |
7.420.313 |
6.416.115 |
5.137.250 |
V.10/27 |
48/219,1 |
477.506.263 |
9.912.245 |
6.995.564 |
6.048.848 |
4.843.186 |
V.10/29 |
48/259 |
525.755.509 |
10.913.820 |
7.702.425 |
6.660.049 |
5.332.562 |
V.10.30 |
48/271,56 |
540.476.285 |
11.219.399 |
7.918.087 |
6.846.525 |
5.481.870 |
V.10/32 |
Harega Desember 2013 kluster bukit ALAMANDA Rumah Real Estat
Tipe, LB/LT |
Harga |
Harga |
Harga |
Keterangan |
Tunai |
24 bulan |
KPR ke-2 |
|
|
48/479.31 |
789.931.126 |
944.217.352 |
904.895.795 |
V.01.035 |
48/274,44 |
549.390.655 |
658.793.786 |
631.474.253 |
V.10/18 |
48/242,57 |
511.660.559 |
613.517.671 |
588.084.643 |
V.10/27 |
48/219,1 |
482.375.013 |
578.487.515 |
554.481.264 |
V.10/29 |
48/259 |
531.111.625 |
636.858.950 |
610.453.369 |
V.10.30 |
48/271,56 |
545.981.095 |
654.702.314 |
627.553.259 |
V.10/32 |
Mdoal pertama = DP + Biaya KPR + Biaya surat2
Tipe, LB/LT |
Harga |
DP 30% |
PLAFON KPR |
Estimasi |
Modal Pertama |
Keterangan |
KPR ke-2 |
bea KPR |
DP+bea kpr |
|
|||
48/479.31 |
904.895.795 |
271.468.739 |
633.427.057 |
31.671.353 |
303.140.091 |
V.01.035 |
48/274,44 |
631.474.253 |
189.442.276 |
442.031.977 |
22.101.599 |
211.543.875 |
V.10/18 |
48/242,57 |
588.084.643 |
176.425.393 |
411.659.250 |
20.582.963 |
197.008.355 |
V.10/27 |
48/219,1 |
554.481.264 |
166.344.379 |
388.136.885 |
19.406.844 |
185.751.223 |
V.10/29 |
48/259 |
610.453.369 |
183.136.011 |
427.317.358 |
21.365.868 |
204.501.879 |
V.10.30 |
48/271,56 |
627.553.259 |
188.265.978 |
439.287.281 |
21.964.364 |
210.230.342 |
V.10/32 |
Angsuran dengan asumsi bunga 9%
Tipe, LB/LT |
PLAFON KPR |
Angsuran KPR/bln (Bunga 9%, BCA) |
Keterangan |
|||
5th |
8th |
10th |
15th |
|
||
48/479.31 |
633.427.057 |
13.148.904 |
9.279.835 |
8.023.986 |
6.424.639 |
V.01.035 |
48/274,44 |
442.031.977 |
9.175.857 |
6.475.858 |
5.599.474 |
4.483.383 |
V.10/18 |
48/242,57 |
411.659.250 |
8.545.369 |
6.030.892 |
5.214.725 |
4.175.322 |
V.10/27 |
48/219,1 |
388.136.885 |
8.057.083 |
5.686.284 |
4.916.754 |
3.936.743 |
V.10/29 |
48/259 |
427.317.358 |
8.870.406 |
6.260.286 |
5.413.076 |
4.334.137 |
V.10.30 |
48/271,56 |
439.287.281 |
9.118.881 |
6.435.648 |
5.564.706 |
4.455.544 |
V.10/32 |
Harga 14 Juni 2013
Tipe, LB/LT |
Harga |
Harga |
Harga |
Tunai |
12 bulan |
KPR |
|
48/479.31 |
739.616.898 |
832.037.760 |
813.553.587 |
48/274,44 |
519.823.290 |
584.769.951 |
571.780.619 |
48/242,57 |
484.853.933 |
545.429.424 |
533.314.326 |
48/219,1 |
457.601.475 |
514.770.409 |
503.336.623 |
48/259 |
502.881.750 |
565.710.719 |
553.114.925 |
48/271,56 |
516.663.210 |
581.214.861 |
568.304.531 |
Modal pertama = Dp + Biaya KPR (lihat promo gratis biaya kpr)
Tipe, LB/LT |
Harga |
DP 10% |
PLAFON KPR |
Estimasi |
estimasi |
Modal Pertama |
KPR |
bea KPR |
bea surat2 |
DP+bea kpr |
|||
48/479.31 |
813.553.587 |
81.355.359 |
732.198.228 |
36.609.911 |
sdh |
117.965.270 |
48/274,44 |
571.780.619 |
57.178.062 |
514.602.557 |
25.730.128 |
sdh |
82.908.190 |
48/242,57 |
533.314.326 |
53.331.433 |
479.982.893 |
23.999.145 |
sdh |
77.330.577 |
48/219,1 |
503.336.623 |
50.333.662 |
453.002.961 |
22.650.148 |
sdh |
72.983.810 |
48/259 |
553.114.925 |
55.311.493 |
497.803.433 |
24.890.172 |
sdh |
80.201.664 |
48/271,56 |
568.304.531 |
56.830.453 |
511.474.078 |
25.573.704 |
sdh |
82.404.157 |
Angsuran KPR dengan sumsi bunga 7.5%, DP 10%
Tipe, LB/LT |
PLAFON KPR |
Angsuran KPR/bln (Bunga 7.5, BCA) |
Keterangan |
|||
5th |
8th |
10th |
15th |
|
||
48/479.31 |
732.198.228 |
14.671.750 |
10.165.745 |
8.691.323 |
6.787.568 |
V.01.035 |
48/274,44 |
514.602.557 |
10.311.580 |
7.144.675 |
6.108.423 |
4.770.429 |
V.10/18 |
48/242,57 |
479.982.893 |
9.617.873 |
6.664.020 |
5.697.482 |
4.449.501 |
V.10/27 |
48/219,1 |
453.002.961 |
9.077.250 |
6.289.434 |
5.377.225 |
4.199.393 |
V.10/29 |
48/259 |
497.803.433 |
9.974.960 |
6.911.438 |
5.909.015 |
4.614.699 |
V.10.30 |
48/271,56 |
511.474.078 |
10.248.891 |
7.101.240 |
6.071.288 |
4.741.428 |
V.10/32 |
Harga 1-25 Mei 2013 Bukit Alamanda
Tipe |
Harga |
Harga |
Harga |
LB/LT |
Tunai |
12 bulan |
KPR |
38/90 |
260,337,000 |
292,879,125 |
286,370,700 |
48/479.31 |
708,914,745 |
797,529,088 |
779,806,220 |
48/274.44 |
500,952,380 |
563,571,428 |
551,047,618 |
48/242.57 |
467,823,515 |
526,301,454 |
514,605,867 |
48/219.1 |
441,926,450 |
497,167,256 |
486,119,095 |
48/259 |
484,902,500 |
545,515,313 |
533,392,750 |
48/271.56 |
497,958,620 |
560,203,448 |
547,754,482 |
Modal pertama = DP + Biaya KPR.
Tipe |
Harga |
dp 10% |
PLAFON KPR |
Estimasi |
estimasi |
Modal Pertama |
Keterangan |
LB/LT |
KPR |
bea KPR |
bea surat2 |
DP+ bea kpr |
|
||
38/90 |
286,370,700 |
28,637,070 |
257,733,630 |
12,886,682 |
sdh termasuk |
41,523,752 |
v.01/27 |
48/479.31 |
779,806,220 |
77,980,622 |
701,825,598 |
35,091,280 |
sdh termasuk |
113,071,902 |
v.01/035 |
48/274.44 |
551,047,618 |
55,104,762 |
495,942,856 |
24,797,143 |
sdh termasuk |
79,901,905 |
v.10/18 |
48/242.57 |
514,605,867 |
51,460,587 |
463,145,280 |
23,157,264 |
sdh termasuk |
74,617,851 |
v.10/27 |
48/219.1 |
486,119,095 |
48,611,910 |
437,507,186 |
21,875,359 |
sdh termasuk |
70,487,269 |
v.10/29 |
48/259 |
533,392,750 |
53,339,275 |
480,053,475 |
24,002,674 |
sdh termasuk |
77,341,949 |
v.10/30 |
48/271.56 |
547,754,482 |
54,775,448 |
492,979,034 |
24,648,952 |
sdh termasuk |
79,424,400 |
v.10/32 |
Cicilan bunga 7.5%, DP 10%
Tipe |
Harga |
dp 10% |
PLAFON KPR |
Angsuran KPR/bln (Bunga 7,5%) |
|||
LB/LT |
KPR |
5th |
8th |
10th |
15th |
||
38/90 |
286,370,700 |
28,637,070 |
257,733,630 |
5,164,453 |
3,578,340 |
3,059,344 |
2,389,223 |
48/479.31 |
779,806,220 |
77,980,622 |
701,825,598 |
14,063,145 |
9,744,056 |
8,330,794 |
6,506,010 |
48/274.44 |
551,047,618 |
55,104,762 |
495,942,856 |
9,937,677 |
6,885,606 |
5,886,929 |
4,597,452 |
48/242.57 |
514,605,867 |
51,460,587 |
463,145,280 |
9,280,481 |
6,430,249 |
5,497,616 |
4,293,414 |
48/219.1 |
486,119,095 |
48,611,910 |
437,507,186 |
8,766,746 |
6,074,293 |
5,193,288 |
4,055,746 |
48/259 |
533,392,750 |
53,339,275 |
480,053,475 |
9,619,287 |
6,665,000 |
5,698,320 |
4,450,155 |
48/271.56 |
547,754,482 |
54,775,448 |
492,979,034 |
9,878,289 |
6,844,457 |
5,851,748 |
4,569,977 |