Harga Agustus 2016 Bukit Matoa
Tipe | LB/LT | Harga | Harga | Harga |
Tunai | 12 bulan | KPR ke-1 | ||
Matoa 1 (1KT) | 22/72 | 165.072.500 | 186.081.563 | 181.879.750 |
Matoa 2 (2KT) | 36/90 | 243.847.500 | 274.703.438 | 268.532.250 |
Matoa 3 (2KT) | 38/120 | 350.222.500 | 394.375.313 | 385.544.750 |
Matoa 4 (3KT) | 47/180 | 516.253.750 | 581.160.469 | 568.179.125 |
Modal Pertama = DP 5% + Biaya KPR (lihat Promo)
Tipe | LB/LT | Harga | DP 5% | Estimasi | Modal Pertama |
KPR ke-1 | Biaya KPR | DP+ biaya KPR | |||
Matoa 1 (1KT) | 22/72 | 181.879.750 | 9.093.988 | 8.639.288 | 17.733.276 |
Matoa 2 (2KT) | 36/90 | 268.532.250 | 13.426.613 | 12.755.282 | 26.181.894 |
Matoa 3 (2KT) | 38/120 | 385.544.750 | 19.277.238 | 18.313.376 | 37.590.613 |
Matoa 4 (3KT) | 47/180 | 568.179.125 | 28.408.956 | 26.988.508 | 55.397.465 |
Simulasi Angsuran dengan asumsi dp 5% dan bunga 8.5%
Tipe | LB/LT | Harga | Angsuran KPR/bln (Bunga 8.5%) | |||
KPR ke-1 | 5th | 10th | 15th | 20th | ||
Matoa 1 (1KT) | 22/72 | 181.879.750 | 3.544.965 | 2.142.296 | 1.701.490 | 1.499.475 |
Matoa 2 (2KT) | 36/90 | 268.532.250 | 5.233.883 | 3.162.945 | 2.512.126 | 2.213.866 |
Matoa 3 (2KT) | 38/120 | 385.544.750 | 7.514.539 | 4.541.193 | 3.606.781 | 3.178.555 |
Matoa 4 (3KT) | 47/180 | 568.179.125 | 11.074.212 | 6.692.378 | 5.315.330 | 4.684.251 |
Harga KPR ke-2, Angsuran ke developer 24 bulan
Tipe | LB/LT | Harga | Harga | Harga |
Tunai | 24 bulan | KPR ke-2 | ||
Matoa 1 (1KT) | 22/72 | 165.072.500 | 198.687.000 | 190.283.375 |
Matoa 2 (2KT) | 36/90 | 243.847.500 | 293.217.000 | 280.874.625 |
Matoa 3 (2KT) | 38/120 | 350.222.500 | 420.867.000 | 403.205.875 |
Matoa 4 (3KT) | 47/180 | 516.253.750 | 620.104.500 | 594.141.813 |
Modal Pertama = DP 30% + Biaya KPR (lihat Promo). Saat ini bisa juga dengan dp 20% sesuai aturan BI terbaru
Tipe | LB/LT | Harga | DP 30% | Estimasi | Modal Pertama |
KPR ke-2 | Biaya KPR | DP+ biaya KPR | |||
Matoa 1 (1KT) | 22/72 | 190.283.375 | 57.085.013 | 6.659.918 | 63.744.931 |
Matoa 2 (2KT) | 36/90 | 280.874.625 | 84.262.388 | 9.830.612 | 94.092.999 |
Matoa 3 (2KT) | 38/120 | 403.205.875 | 120.961.763 | 14.112.206 | 135.073.968 |
Matoa 4 (3KT) | 47/180 | 594.141.813 | 178.242.544 | 20.794.963 | 199.037.507 |
Simulasi Angsuran dengan asumsi dp 30% dan bunga 8.5%. Saat ini bisa juga dengan dp 20% sesuai aturan BI terbaru
Tipe | LB/LT | Harga | Angsuran KPR/bln (Bunga 8.5%) | |||
KPR ke-2 | 5th | 10th | 15th | 20th | ||
Matoa 1 (1KT) | 22/72 | 190.283.375 | 2.732.768 | 1.651.469 | 1.311.657 | 1.155.926 |
Matoa 2 (2KT) | 36/90 | 280.874.625 | 4.033.801 | 2.437.710 | 1.936.118 | 1.706.247 |
Matoa 3 (2KT) | 38/120 | 403.205.875 | 5.790.670 | 3.499.423 | 2.779.369 | 2.449.380 |
Matoa 4 (3KT) | 47/180 | 594.141.813 | 8.532.810 | 5.156.556 | 4.095.525 | 3.609.270 |